Paper Title:
Defects Inspection and Cause Analysis of Six Tunnels in Chongqing
  Abstract

This paper presents defects inspection and cause analysis of six road tunnels in Chongqing based on information of construction, operation and maintenance, defects property and related factors. The unfavorable factors including ground disturbance and load nearby, complex structure form, construction deformation that threaten the safety of tunnel structure and operation are thoroughly analyzed. Based on the discussion and analysis recommendation and suggestion on measures of urban tunnel maintenance and management are carried out. Experience gained is helpful for future urban road tunnel maintenance and management.

  Info
Periodical
Advanced Materials Research (Volumes 261-263)
Edited by
Jingying Zhao
Pages
1261-1264
DOI
10.4028/www.scientific.net/AMR.261-263.1261
Citation
J. Y. Zheng, H. J. Liu, Z. L. Zou, "Defects Inspection and Cause Analysis of Six Tunnels in Chongqing", Advanced Materials Research, Vols. 261-263, pp. 1261-1264, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Hui Li, Hong Yuan, Li Li Dong
Abstract:At present, there are many problems in the landscape design of waterfront area in Chongqing city. With the build of Tree Gorge Reservoir,...
1473
Authors: Gang Chen, Fu Jia Liu
Chapter 10: Reproduction and Inherit of Local Architecture
Abstract:As a city's essence, the urban public space is a space for the growth of vigorous activity. In reality, it has lost, and the concern of it is...
3447
Authors: Zhong Fu Xiang, Yong Zeng
Chapter 2: Computational Mechanics and Engineering Applications
Abstract:A brief introduction is given about the history and current situation of Chongqing Bridge. Several combination bridges are introduced in...
45
Authors: Xiao Lin Cao, Liu Dan Jiao
Chapter 8: Transportation Planning, Construction and Operation Organization
Abstract:Through analyzing the development of the present situation and planning of highways of Chongqing, this paper indicated that the becoming of...
1254
Authors: Wei Zhou Li, Zhong Ju Feng, Dong Liang Xun, Sheng Rong Zuo, Xiao Jun Che, Yang Wang, Cheng Chen
Chapter 8: Bridge Engineering
Abstract:Chongqing Chaotianmen Bridge is by far the world's largest three-span continuous half-through double-layer steel truss tied arch bridge. Risk...
1353