Analysis of Tunnel Defect Characteristic Caused by Cavities behind Lining
  Abstract

Back-cavity of lining is a main factor resulting in tunnel defect. But as the concealment of the cavities behind linings, it is hard to judge the existence and conditions of cavities. In this paper numerical simulation analysis was carried out to analyze the mechanics of lining when there were different size of cavities which located in vault, hance, sidewall or foot of sidewall respectively, then to study the tunnel defect caused by back-cavity and set up corresponding relationship between cavity condition and tunnel defect. The research has some auxiliary help for rapid diagnosis of tunnel defect according to defect characteristics observed in site inspection.

  Info
Periodical
Advanced Materials Research (Volumes 261-263)
Edited by
Jingying Zhao
Pages
1265-1269
DOI
10.4028/www.scientific.net/AMR.261-263.1265
Citation
W. Wang, S. C. Liao, P. Ding, D. Z. Chen, "Analysis of Tunnel Defect Characteristic Caused by Cavities behind Lining", Advanced Materials Research, Vols. 261-263, pp. 1265-1269, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Shan Yong Wang, S.K. Au, K.C. Lam, Chun An Tang
Abstract:By using numerical code RFPA2D (Rock Failure Process Analysis), the evolution of fracture around cavities subjected to uniaxial and polyaxial...