Paper Title:
Experimental Study on Timeliness of Pullout Force of Grouting Soil Nailing
  Abstract

Pullout force of grouting soil nailing is a key to support. This test revealed that limit pullout force of soil nailing increased with the time. The timeliness function was asked for by Origin software. It's the cause for many failure accidents in soil nailing support engineering. But it was often neglected in engineering design and construction.

  Info
Periodical
Advanced Materials Research (Volumes 261-263)
Edited by
Jingying Zhao
Pages
1480-1483
DOI
10.4028/www.scientific.net/AMR.261-263.1480
Citation
K. Y. Wang, H. G. Ji, "Experimental Study on Timeliness of Pullout Force of Grouting Soil Nailing", Advanced Materials Research, Vols. 261-263, pp. 1480-1483, 2011
Online since
May 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jiang Shu Ding, Yao Qiang Xian, Tian Jun Liu
Abstract:Combined with one foundation pit engineering in Guangzhou, the method was adopted in this paper, by which the in-situ test and finite element...
2358
Authors: Jian Hua Huang
Chapter 1: Geological and Geotechnical Engineering
Abstract:Base on general three dimension nonlinear numerical simulation software, mechanism of composite soil-nail retaining structures in...
163
Authors: Chang Wen Chen
Chapter 17: Computer Applications in Industry and Civil Engineering
Abstract:On the basis of a typical engineering, a foundation of soil nailing walls supporting simulation model of soil nailing on the structure of the...
2906
Authors: Qing Ping Jin, Zu Jia Zheng, Bin Qiang Dou, Xue Wen Lei
Chapter 9: Geotechnical Engineering
Abstract:The mechanical performance of GFRP soil nailing in the supporting structure is an important and difficult problem. By implanting the fiber...
539