Paper Title:
The Stability Analysis of Slope of Shegang Protecting Dyke
  Abstract

Appraisal of dam slope safety is essential for security and stability of the dyke that has been constructed for many years. According to the requirements of the appraisal of dam safety, the stability analysis of slope of Shegang dyke has been carried out by using Sweden circular-arc method, Bishop method, Engineer Corps method and Lowe method four methods under many kinds of working conditions and some conditions when the saturation line raising. Combined with the design code form embankment dam, the calculation results can be analyzed. The analysis can show that the security indexes of anti-slide under four kinds of working conditions and some conditions when the saturation line raising meet the requirements of the design code. This can provide basis for the reinforcement design of the dam, which also has a certain directive significance for the safe operation and observation of the dam in the future.

  Info
Periodical
Advanced Materials Research (Volumes 261-263)
Edited by
Jingying Zhao
Pages
1841-1845
DOI
10.4028/www.scientific.net/AMR.261-263.1841
Citation
H. Q. Yao, "The Stability Analysis of Slope of Shegang Protecting Dyke", Advanced Materials Research, Vols. 261-263, pp. 1841-1845, 2011
Online since
May 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Li Hong Chen, Jian Yang, You Ren Yuan, Tao Sun
Abstract:Linear and nonlinear shear strength models of rockfill, and the safety factor criterion of nonlinear shear strength were discussed in this...
2732
Authors: Lin Ke Li, Ai Jun Zhang, Jin Yu Liu, Chun Jiao Hou, Hao Dong Li
Abstract:A new method that 3D numerical simulation combined with anti-cut stability analysis is employed to analyze the stability of Majiabian gravity...
2624
Authors: Chang Chun Wu
Chapter 8: Hydraulic Engineering
Abstract:Through project examples, this paper set up a two-dimensional finite element seepage flow model with the help of the Auto-BANK software, to...
2699
Authors: Shuai Liu, Hui Peng, Chong Yang Zheng, Shao Lin Liu, Qin Long Yan
Chapter 4: Flood and Drought Management
Abstract:To solve the risk model for dam overtopping and instability of dam slope in the embankment systematic risk, the structural reliability theory...
780
Authors: Liang Song, Zhen Xing Yang, Hao Wang, Zi Hao Wang, Huan Qiang Zhang
Chapter 1: Geological and Geotechnical Engineering
Abstract:The tailing pond of Wushan copper mine is located in a valley among the mountains, with kinds of hidden troubles like the overflow of the...
207