Paper Title:
Web-Based Visualization for Hydrodynamic Model of Flood Retarding Basin: A Case of Doingping Lake
  Abstract

Hydrodynamics based numerical model is an effective way to simulate the movement of flood and its result can be visualized by many post-processing softwares. However, most of these tools are available only as local applications. This both limits the accessibility of the software to a specific machine and collaborative research. In this paper, we introduce a four-layer architecture for web-based visualization of numerical model. The application uses VTK(Visualization Toolkit) to render the numerical result and then the VRML standard is used to provide dynamic features over the web. By developing web-based visualization tools, it is possible for users to access the situation of flood wherever the internet is available, and can largely promotes the public services such as flood risk management.

  Info
Periodical
Advanced Materials Research (Volumes 268-270)
Edited by
Feng Xiong
Pages
1451-1456
DOI
10.4028/www.scientific.net/AMR.268-270.1451
Citation
R. X. Lai, R. L. Xia, M. Wang, "Web-Based Visualization for Hydrodynamic Model of Flood Retarding Basin: A Case of Doingping Lake", Advanced Materials Research, Vols. 268-270, pp. 1451-1456, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zhi Xiang Yin, Zhe Gao, Yao Feng
Abstract:It has been proved that Multi-layer network computing can solve the nonlinear separable problem, but the problem which the hidden layer makes...
2666
Authors: Zhi Bo Ren, Lei Sun, Yao Deng
Chapter 7: Pollution Control (Air, Water, Solid)
Abstract:In order to improve the efficiency of CFB-FGD (circulated fluidized bed for flue gas desulfurization) in many thermal power plants, this...
1601
Authors: Xiao Cheng Su, Zhi Liu, Xiao Yun Wang
Chapter 11: Hydrology, Coastal and Hydraulic Engineering
Abstract:The South-to-North Water Transfer Project is a cross century water diversion project. So it is very important to ensure its normal operation....
1248