Paper Title:
Fuzzy Comprehensive Evaluation of Mine Production Business Status Based on AHP
  Abstract

Taking an iron mine in Shandong province as an example, building model by using analytic hierarchy process and fuzzy comprehensive evaluation method, evaluated the production and business operation condition of the three points ore mine. The analysis procedure was: first to select 10 factors which were more important among many internal factors influencing production and business operation status, and then to reuse analytic hierarchy process in two layers to determine various factors’ weight, finally to vote for the best point’s ore of operating conditions by fuzzy comprehensive evaluation. Judging from the final results, two kinds of combining methods could draw a satisfactory effect. The innovation of the paper not only lay in that a set of quantitative data were transformed into qualitative data, but more important was that the quantitative evaluation and qualitative evaluation were merged completely.

  Info
Periodical
Edited by
Zhenyu Du and Chengbin Li
Pages
169-173
DOI
10.4028/www.scientific.net/AMR.281.169
Citation
Y. C. Sun, T. Li, "Fuzzy Comprehensive Evaluation of Mine Production Business Status Based on AHP", Advanced Materials Research, Vol. 281, pp. 169-173, 2011
Online since
July 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Hong Wei Yang, Xiao Liang Guo, Ding Dong Huang, Yang Zhuo Wei
Chapter 5: Storage Technology
Abstract:As the embedded modernization of military equipment, the equipment sustainable development faces the severe development "bottleneck", mainly...
2791
Authors: Ming Zhang, Jiang Yu, Chun Ying Qi, Xiao Qiang Huo
Chapter 13: Modeling, Analysis and Simulation of Manufacturing Processes
Abstract:According to the special characteristics of engineering equipment supportability in operation phase, we establish a completed parameter index...
3652
Authors: Ming Zhang, Chun Ying Qi, Long Yuan, Mei Zhang
Chapter 11: Manufacturing Process Planning and Scheduling
Abstract:As a result of the complicated framework, there are many difficulties to assess assignment plan of engineering series equipment. The purpose...
3334
Authors: Guang Yu Zhang, Qing Min Li, En Shun Ge
Chapter 2: Dynamics of Mechanisms and Systems
Abstract:Increasing sophistication of naval shipboard machinery coupled with increasing competition for skilled manpower and tightening of defense...
729
Authors: Hong Qiang Gu, Hui Song, Cheng Zhang
Chapter 3: Supply Chain
Abstract:Conducting the performance evaluation of equipment supports parts supply chain timely and accurately can provide reliable information for...
553