  Abstract

The high precision surveying control network provides the positional and orientation datum for the construction and measure-control system of the Five- hundred-meter Aperture radio Sphere Telescope(FAST), which is deployed at the typical Karst depression. The design of the control network is in accordance with the 1:1000 topographic maps. The issues about the control station site selection ,distribution and construction are analyzed and discussed, and the initial results are provided in this paper.

  Info
Periodical
Advanced Materials Research (Volumes 301-303)
Chapter
Chapter 2: Measuring and Testing Techniques
Edited by
Riza Esa and Yanwen Wu
Pages
932-936
DOI
10.4028/www.scientific.net/AMR.301-303.932
Citation
Y. B. Luo, L. C. Zhu, W. L. Ma, "Initial Design of FAST Engineering Surveying Control Network", Advanced Materials Research, Vols. 301-303, pp. 932-936, 2011
Online since
July 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zhen Chen
Chapter 28: Electricity Infrastructure and Power Transmission
Abstract:On the basis of monitoring surface deformation in some area subject to large transmission line tower base hazard, monitoring method...
3406
Authors: Jia Na Li, Kun Zhang
Chapter 12: Surveying Engineering, Cartography and Geographic Information Systems
Abstract:Since the area of Southwest China crosses the first ladder and the second one ,thus it is featured with precipitous terrains. Owing to such...
1714