Paper Title:
Study on the Balancing and Improving of Assembling Line for a Type of Scanner Shell
  Abstract

The paper analyzed practical problems of scanner shell assembling lines according to the principle of line balancing. Some unreasonable arrangements of workstation and operation are improved by using some ways of industrial engineering, such as 5W1H question technology and ECRS analytical method. The results show that the efficiency of assembling line is greatly updated.

  Info
Periodical
Advanced Materials Research (Volumes 314-316)
Chapter
Digital Manufacture and Management
Edited by
Jian Gao
Pages
2023-2026
DOI
10.4028/www.scientific.net/AMR.314-316.2023
Citation
W. X. Yao, "Study on the Balancing and Improving of Assembling Line for a Type of Scanner Shell", Advanced Materials Research, Vols. 314-316, pp. 2023-2026, 2011
Online since
August 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Ze Qiang Zhang, Wen Ming Cheng
Abstract:The basic U-shaped line balancing problem (ULBP) model usually needs to be extended in order to solve real-world line balancing problems....
1046
Authors: Wei Xin Yao
Abstract:This paper applied stopwatch to measure the work time of workstations on lamp assembling line. It studied issues effecting line production...
751
Authors: Yan Hua Ma, Fan Sen Kong, Ying Jiang, Yu Zhang, Yan Ao
Abstract:The article elaborates the fundamental notion theory of assembly line balancing, aiming at F company’s assembly line actuality. It solves the...
3731
Authors: Wen Li Li, Chun Lei Song, Li Sha Han
Chapter 2: New Material Application in Manufacturing
Abstract:This paper applies the methods of Work Study to a certain hydraulic component company. We apply the work measurement method to measure the...
206
Authors: Hartini Mustafa, Ahmad Razlan Yusoff, M. Yusoff Ismail
Chapter 10: Manufacturing Systems and Engineering
Abstract:Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem...
700