Procurement Mode Research on Open Solicitation of Qualified Suppliers for the Construction of Guangzhou Asian Games Stadiums
  Abstract

Open solicitation for qualified suppliers, expert assessment, establishment of qualified suppliers database, reassessment and other procurement modes are applied in bids of large-scaled public construction engineering so that contractors could select the materials according to the qualified suppliers database and an effective way could be ensured to the procurement of large public construction engineering with high technical contents, high construction costs and key roles in the operation of the system. Such modes have been applied in the renovation of Guangzhou Asian Games Stadiums during which the whole process control measures have been taken from the qualification verification, sample test, orders, manufacturing to on-site quality inspection, installation, commissioning, etc. so as to ensure the conformity of materials and electromechanical equipment to the design requirements and guarantee the construction quality.

  Info
Periodical
Advanced Materials Research (Volumes 317-319)
Chapter
Construction Machinery and Equipment
Edited by
Xin Chen
Pages
2482-2489
DOI
10.4028/www.scientific.net/AMR.317-319.2482
Citation
G. L. Zhang, J. Li, "Procurement Mode Research on Open Solicitation of Qualified Suppliers for the Construction of Guangzhou Asian Games Stadiums", Advanced Materials Research, Vols. 317-319, pp. 2482-2489, 2011
Online since
August 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Chun Ping Ouyang, Chang Jun Hu, Zhen Yu Liu, Yang Li
Abstract:Material is the foundation of engineering construction, and materials service safety assessment is an important issue for public security....
94
Authors: Hui Wang, Huan Xia Jin, Ji Tao Fang
Chapter 3: Measuring Technology and Mechatronics
Abstract:At present the coating thickness and uniformity of tower materials provided by the suppliers are tested through the visual method by the...
1687
Authors: Jie Liu, Jie Pan
Chapter 18: Engineering Management
Abstract:There is lack of building materials in Tibetan areas of PRC, and its region is vast, so even the ordinary materials are usually expensive...
2990
Authors: Wen Hua Liu
Chapter 16: Miscellaneous Topics
Abstract:Based on the comparative analysis on the undergraduate program for specialty in materials engineering in the two universities at home and...
1873
Authors: Huan Zhou, Jian Huan Zhao
Chapter 4: Other Engineering Solutions for Manufacturing
Abstract:Building material cost accounts for about 65% of the engineering cost, and some even reach more than 75% in the current formation of the...
668