Paper Title:
Research and Design of Data-Interpreting Expert System for Geographical Prospecting of Dike Hazard
  Abstract

Based on the characteristics of geographical prospecting data of dike hazard, this paper discusses the design of the data-interpreting expert system for dike hazard, researches the calculation procedure of inference mechanism and the construction of knowledge base. In the process of design, constructing complete knowledge base and based on the production rule, vogue inference is realized. A combination is also made between inference process and interpretive mechanism, to enhance the operation efficiency of the system, putting the system in better communication and interaction with the user. Research results show that this system can effectively integrate expert knowledge, reasonably configure data resource and enhance the reliability of interpretive achievement of hazard data.

  Info
Periodical
Chapter
Chapter 2: Innovation Engineering Management
Edited by
Yuhang Yang and Yan Ma
Pages
172-175
DOI
10.4028/www.scientific.net/AMR.323.172
Citation
L. Yang, Y. Zhou, "Research and Design of Data-Interpreting Expert System for Geographical Prospecting of Dike Hazard", Advanced Materials Research, Vol. 323, pp. 172-175, 2011
Online since
August 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: De Hua Mao, Zhi Long Li, Xin Guang He, Zheng Zui Li, Dong Run Liu, Ka Bo Liu
Chapter 5: Frontiers of Environment Engineering and Materials
Abstract:Comprehensive risk analysis mode including overtopping risk, slide instability risk and seepage risk has been established. Chaishanhu section...
2661
Authors: Jie Zhao, Yang Zheng, Gui Xuan Wang
Abstract:In seismic response analysis, total stress method is adopted mostly, but variation of the pore water pressure and the development process of...
1865
Authors: Qing Ming Zhang, Shuai Xu, Yuan Bao Leng
Abstract:Dike is an important component of Yellow River flood control system, but its security situation is not optimistic. High-density electrical...
246
Authors: Xi Zhong Shen, Xiao Ping Yang, Wei Dong Ma
Chapter 6: Applied Mechanics and Mechanical Engineering
Abstract:Evaluation indexes (monitoring value) set in safety evaluation of dike, it was difficult in conforming the range of evaluation indexes, and...
1249
Authors: Rui Wang, Lei Yang, Xuan Lou, Yang Zhou
Chapter 3: Mechatronics, Control, Measurement and Monitoring. Technologies and Solutions
Abstract:A dike risk model experiment is introduced in this paper. Researchers use a 3D laser scanner to scan the dike model before and after a...
1085