Paper Title:
Discussion of Quality Management of Large Complex Equipment under the Cross State of Development and Production
  Abstract

The development of large complex equipment takes very long and needs to reduce the time introduced to the market. The cross state of development and production appears frequently because of the tight schedule. The cross may result in instability problems of quality and would delay development schedule ultimately. In order to ensure the quality and schedule, the method and strategy used for the cross state of development and production are discussed in this paper. The main problems caused by the cross situation are analyzed. And then the solution is proposed to the question, that is the management process needs to be infused with more in-depth systems analysis during the early stages and planned using tenets of process control, configuration management and integrated test & evaluation methods. These approaches may accelerate the exposure of technical problems as far to the left as possible. Therefore such management process could help to ensure the quality consistency and schedule under the cross state of development and production.

  Info
Periodical
Advanced Materials Research (Volumes 328-330)
Chapter
Chapter 3: Mechatronics and Automation
Edited by
Liangchi Zhang, Chunliang Zhang and Zichen Chen
Pages
2390-2393
DOI
10.4028/www.scientific.net/AMR.328-330.2390
Citation
X. C. Zhang, J. C. Wang, X. N. Sun, Y. J. Wang, "Discussion of Quality Management of Large Complex Equipment under the Cross State of Development and Production", Advanced Materials Research, Vols. 328-330, pp. 2390-2393, 2011
Online since
September 2011
Export
Price
$35.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: H.B. Miao
Abstract:Conceptual design for the mechanical products is the most important and complex phase. Most of the human’s creativity is exhibited in this...
198
Authors: Qiu Lian Wang, Cong Bo Li
Abstract:To provide referenced risk assessment model for implementing remanufacturing program in enterprise, a set of evaluating indicators was...
1382
Authors: Ming Shan Cai, Ling Shuang Kong
Abstract:Based on the strong coupling and interval requirement of multiple quality indices, the interval-index-oriented optimization method is...
546
Authors: Miao Fen Zhu, Shao Hui Su, You Ping Gong, Guo Jin Chen
Abstract:The ETO product’s modularity manufacture needs the ETO product’s modular design as a foundation. By fully distinguishing and exploiting the...
1183
Authors: Yong Ming Wang, Shao Peng Wang
Chapter 8: Networks Communication and Information Technologies
Abstract:Network-based diagram document online approval management is imperative. Focusing on the development of an enterprise diagram document online...
563