Paper Title:
Proposal and Preliminary Study on Installed Capacity Margin
  Abstract

The capacity of thermal power plants takes up 75 per cent of whole power generation capacity in China, and so a reserve of generation capacity margin that may adapt to the variations in power network load is of paramount importance. This paper proposes a concept: installed capacity margin, and basic mathematic modeling and example is analyzed. It would be supply theoretical help for real little thermal power plants shutdown schedules based on building detailed mathematical models after investigation of region-specific load structure characteristics and installed generator compositions.

  Info
Periodical
Advanced Materials Research (Volumes 354-355)
Chapter
Chapter 6: Power System and Automation
Edited by
Hao Zhang, Yang Fu and Zhong Tang
Pages
872-876
DOI
10.4028/www.scientific.net/AMR.354-355.872
Citation
X. C. Huang, X. Z. Chai, "Proposal and Preliminary Study on Installed Capacity Margin", Advanced Materials Research, Vols. 354-355, pp. 872-876, 2012
Online since
October 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Zhen Kun Li, Da Wei Liu, Chun Feng Wei, Yang Fu
Chapter 6: Power System and Automation
Abstract:The optimal capacity-load-ratio has great significance to the distribution network’s planning. It’s an important technical indicator of...
733
Authors: Hao Yang, Fei Tang
Chapter 9: Energy Control and Power Systems, Electrical and Electronic Engineering
Abstract:There is different applicable transmission capacity and range between 1000kV and 500kV AC transmission. The traditional method is to use the...
1139