Paper Title:
Analysis of Wall Rock Settlement on Section of Super Shallow Four-Arch Tunnel
  Abstract

With the development of subway in major cities, the density of underground railway tunnel increases. At the same time, the form and the area of subway tunnel become different. All these make higher requirements for stability of wall rock. The super section shallow multi-arch tunnel between Hananzhan Station and Nongkeyuan Station of Harbin subway ,with the twin-side heading tunnel construction method do harm to the wall rock for many times. It becomes more difficult for below the main road. This paper, using finite element analysis ANSYS software to simulate the excavation process, obtains rock settlement of the four-arch tunnel through on-site monitoring data, and further validates the feasibility of the twin-side heading tunnel construction method.

  Info
Periodical
Advanced Materials Research (Volumes 368-373)
Chapter
Chapter 3: Security and Life Cycle Engineering Design of Civil Engineering
Edited by
Qing Yang, Li Hua Zhu, Jing Jing He, Zeng Feng Yan and Rui Ren
Pages
1446-1449
DOI
10.4028/www.scientific.net/AMR.368-373.1446
Citation
R. K. Huo, Y. Z. Yao, Q. X. Yue, "Analysis of Wall Rock Settlement on Section of Super Shallow Four-Arch Tunnel", Advanced Materials Research, Vols. 368-373, pp. 1446-1449, 2012
Online since
October 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Chang Feng Yuan, Guang Ming Yu, Qian Qian Zhao, Jing Bo Zou, Xiao Ming Guan
Abstract:Underground engineering construction in the city can not avoid bringing about perturbation on the surrounding rock and soil and then endanger...
3606
Authors: Yang Kuang, Jun Yang, Ai Cheng Shan
Chapter 4: Theory and Practice of Industrial and Civil Construction
Abstract:Based on the open excavation area from Yulu Station to Wulidian Station in Chongqing subway circle lines, the finite element software Ansys...
510