Earth Pressure Analysis on Subway Deep Excavation near Arch Bridge Abutment
  Abstract

Subway construction involves a large number of excavation engineering. For the restrictions caused by conditions on the spot,Many foundation pits projects showed some features of clear spatial effects, complex stress characteristics,multiplex affecting factors, it often can not be suit for the applicable conditions of the existed earth pressure theory very well. On the background of BeiLing Station Passageway construction in Shenyang Subway Line No.2, Through counting and analyzing the results of three-dimensional numerical simulation in detail,summing up regulations of Taishan bridge abutment displacement in the horizontal plane. Force act on 4,5foundations fender post present trapezium and parabola distribution with depth respectively. So it is concluded the properties of foundation pit earth pressure, proposing a simple calculating model comparing its results with numerical simulation results to verify the reasonableness of the model. So the problem which is how to calculate the earth pressure under the complexity of obvious spatial effects and a variety of environmental conditions can be solved and reference experiences on the calculation of earth pressure can be provided to similar Follow-up projects

  Info
Periodical
Advanced Materials Research (Volumes 368-373)
Chapter
Chapter 6: Geotechnical Engineering and Underground Space Structure
Edited by
Qing Yang, Li Hua Zhu, Jing Jing He, Zeng Feng Yan and Rui Ren
Pages
2955-2959
DOI
10.4028/www.scientific.net/AMR.368-373.2955
Citation
Y. Xu, Z. S. Liu, W. Zhao, "Earth Pressure Analysis on Subway Deep Excavation near Arch Bridge Abutment", Advanced Materials Research, Vols. 368-373, pp. 2955-2959, 2012
Online since
October 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Yan Xu, Zhen Shun Liu, Wen Zhao, Xiao Yan Feng
Chapter 3: Frontiers of Civil Engineering
Abstract:Taking Shenyang metro line 2 concentrated in digging deep foundation pit on Beiling station entrance arch bridge abutment in TaiShan road for...
1831
Authors: Tian Li Wang, Qing Ning Li, Da Lin Hu
Chapter 1: High Strength High Performance Materials and New Structural System
Abstract:It was well known that expansion joint of a bridge was a weak part of structure, it led to early structure destroy and reduced the bridge...
72
Authors: Wan Li Chao, Xing Hua Wang
Chapter 1: Advanced Materials Science
Abstract:The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of...
408
Authors: Kun Yang, Zhi Chao Ma, Hao Han
Chapter 2: Innovation in Civil and Hydraulic Engineering
Abstract:The abutment slope at left bank in Dagangshan hydropower station has complex geological conditions with deep fractures, developed faults and...
313
Authors: Zhi Hua Li, Xin Zhu Hua, Ruo Jun Zhu, De Sheng Zhou
Chapter 20: Mineral Processing, Mining Engineering and Technology
Abstract:In order to study the strata behavior characteristics in super-long and large mining height working face, the FLAC-3D software was used to...
3428