Paper Title:
Application of Comprehensive Geological Exploration for Engineering Site Option
  Abstract

In the process of engineering prospective design and constructing, it is necessary to avoid the adverse impact of geological phenomena, such as fault, karst and landslide. Therefore, it’s important to choose a favorable project address by scientific and effective detection with engineering geological conditions. The main exploration method for geological conditions is the geophysical exploration, including: high density electrical method, ground penetrating Radar, seismic exploration method and so on. The discrimination result with a single geological method changes much, and it is difficult to make an accurate analysis of the geological conditions. So we should composite a variety of exploration methods. In this paper, it expounds the fundamental, the working method, data explanations of the high density electrical method and ground penetrating Radar firstly. And then it takes exploration of candidate sites of an aluminum waste disposal plant for example, the geological conditions of candidate sites are analyzed under the two geophysical methods. The study results of engineering site option have a positive role in guiding the work.

  Info
Periodical
Advanced Materials Research (Volumes 374-377)
Chapter
Chapter 10: Innovative Structures: Technologies and Applications
Edited by
Hui Li, Yan Feng Liu, Ming Guo, Rui Zhang and Jing Du
Pages
2256-2260
DOI
10.4028/www.scientific.net/AMR.374-377.2256
Citation
S. Yong, "Application of Comprehensive Geological Exploration for Engineering Site Option", Advanced Materials Research, Vols. 374-377, pp. 2256-2260, 2012
Online since
October 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Cheng Zhong Yang, Ben Qing Hu
Chapter 9: Information System for Materials and Mechanics
Abstract:The geological conditions of Tunnel are of complexity, variability and uncertainty,So it is a necessary guidance to accurately predict the...
1320
Authors: Shuang Mei Tang, Chun Jiao Lin, Xiao Yao, Chong Xiong He
Chapter 3: Civil Engineering
Abstract:In this paper, a comprehensive advanced geological prediction method in highway double-arch tunnel construction was put forward, which could...
805
Authors: Chong Xiong He, Chun Jiao Lin, Xiao Yao
Chapter 5: Tunnel, Subway and Underground Facilities
Abstract:The paper pointed out a comprehensive advanced geological prediction method combining geological radar with advanced horizontal borehole...
1275
Authors: Peng Yin, Rui Ting Yao, Xiao Lei Ji
Chapter 3: Construction Monitoring and Control for Large-Scale Structures
Abstract:The tunnel involved in this study is a double-track tunnel with a 4113m length and 390m maximum depth which is currently under construction....
279
Authors: Zhong Jie Su, Jing Wang, Lin Wang
Chapter 11: Natural and Technogenic Disasters Prevention and Mitigation
Abstract:The prevention of geological disasters in the coal mine, integrated geophysical technology was used to avoid geological disasters in coal...
2669