Paper Title:
Expected Model for Time-Energy Trade-Off Problem of Product Disassembly
  Abstract

In the actual disassembly decision-making, people may concern multiple evaluation parameters, such as disassembly time and disassembly energy. In order to deal with multiple parameters evaluation problem, the expected model of time-energy trade-off problem of product disassembly process is presented in this paper. Simultaneously, taking the typical transmission device for example, its stochastic time-energy trade-off problem is analyzed. The results provide guidance for disassembly practice.

  Info
Periodical
Advanced Materials Research (Volumes 383-390)
Chapter
Chapter 30: Automation, Mechatronics and Robotics
Edited by
Wu Fan
Pages
7663-7668
DOI
10.4028/www.scientific.net/AMR.383-390.7663
Citation
G. D. Tian, R. J. Liu, Y. M. Liu, J. W. Chu, G. Xu, B. Chen, "Expected Model for Time-Energy Trade-Off Problem of Product Disassembly", Advanced Materials Research, Vols. 383-390, pp. 7663-7668, 2012
Online since
November 2011
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Xiu Fen Zhang, Shu You Zhang, Le Miao Qiu, Xiang Hua An, Ri Na Sa
Abstract:The varying target component virtual disassembly simulation technology is presented to support the disassembly analysis and feedback in...
2467
Authors: Ji Xiang Zhong
Chapter 3: Civil Engineering
Abstract:The assembly building is sought after by people For its speed, subject to the constraints of climate conditions, seismic energy saving and...
1095
Authors: Bo Sun, Shao Yun Zhang, Yan Cao
Chapter 5: Information Processing and Computational Science
Abstract:The generation of assembly plans for a new complicated product is often a lengthy and costly manual process. In this paper, the pose...
1303
Authors: Ji Xiang Zhong
Chapter 15: Construction Techniques and Quality Control
Abstract:The assembly building is sought after by people For its speed, subject to the constraints of climate conditions, seismic energy saving and...
1265
Authors: Jing Zhi, Yan Xu
Chapter 5: Power Systems Engineering
Abstract:In order to avoid the cascading tripping caused by power flow transferring, a fast identification method of two branches simultaneous removal...
666