Paper Title
Page
Authors: Chun Hsiung Lan, Su Yee Ma
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:This study discusses construct an Integer Nonlinear Programming (INLP) mathematical model is presented to solve the Two-Sided assembly line...
4302
Authors: Sheng Wen Fan, Ze Ting Wang
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:A 60kV/6kW full-digital high voltage power supply for electronic beam welder (EBW) is designed. The power is composed of DSP, CPLD, IPM etc....
4306
Authors: Lu Zhang, Yan Ling Shang
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:With the rapid development of database technology and the explosive data growth, we urgently need a new smart technology to help us translate...
4312
Authors: Zai Ping Chen, Yan Lei Guo
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:Controller Area Network (CAN) is widely used in real-time automobile control and is gaining wider acceptance as a standard for factory...
4318
Authors: Xun Yang, Yong Lei
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:It’s important to measure inlet total pressure field for aeroengine. Firstly, test scheme is discussed. Three pectinate total pressure...
4323
Authors: Yan Yan Zhao, Qing Jin Meng, Zhao Liu
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:The waste heat boiler is an important part of waste heat power station in cement plant. So it is highly important to control the drum level...
4329
Authors: Zhong Yuan Li, Bin Duan, Wei Yang
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:Along with the development of domestic wind power and the maturement of technology, equipment in the wind farm and monitoring system provided...
4336
Authors: Xing Jia Yao, Huan Li
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:In order to reduce the tilt moment and yaw moment caused by asymmetric wind, aerodynamic model for individual pitch control of large-scale...
4341
Authors: Shun Yuan, Wei Wang, Feng Li
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:Internal arcing faults in the high voltage switchgear may cause serious damage to the equipment and fatal injury to personnel. To simulation...
4346
Authors: Ze Yun Chao, Wei Jia Fang
Chapter 17: Manufacturing Process Planning and Scheduling
Abstract:In order to assure the inverter could operate either from rectifier utility power or battery packs to provide regulated sinusoidal power for...
4352
Showing 731 to 740 of 1305 Paper Titles