Paper Title:
Rapid Prototyping of Constraint-Based Production Flows in Outsourcing
  Abstract

In this publication a problem of production order planning is considered. The concept of a critical resource and a critical process, a constraint-based approach has been proposed. The question considered regards of an admissible production flow organization-guaranteeing completion of the production order under assumed limits, while taking into account the logistics constraints imposed. In that context the approach proposed can be seen as one following the Goldratt’s Theory of Constraints (TOC).

  Info
Periodical
Advanced Materials Research (Volumes 44-46)
Edited by
Z.Y. Shen, M.N. James, W.D. Li, and Y.X. Zhao
Pages
355-360
DOI
10.4028/www.scientific.net/AMR.44-46.355
Citation
S. Saniuk, A. Saniuk, "Rapid Prototyping of Constraint-Based Production Flows in Outsourcing", Advanced Materials Research, Vols. 44-46, pp. 355-360, 2008
Online since
June 2008
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: You Dong Yang, Wei Qing Guo, Xia Xia Hu
Abstract:Aim at complex relationships among design tasks after task grouping for the collaborative product design process scheduling, the constraint...
822
Authors: Fu Yun Liu, Ni Ya Lu, Bing Kuang
Abstract:To improve the design efficiency of product, the variant design method of assembly is researched. Firstly, the identifying and extracting...
1126
Authors: Xin Sheng Xu, Dan Li, Meng Li Sun
Abstract:Variant design has been recognized as an effective measure to implement mass customization. Assembly consists of different types of parts....
1460
Authors: Lian Liu, Li Hong Qiao
Abstract:Operation sequencing is one of the most important tasks in process planning. The sequencing procedures associate manufacturing features from...
57
Authors: Dan Chen Zhou, Liang Zeng
Chapter 7: Computer Development, Integrated System and Integrated Manufacturing
Abstract:In terms of characteristics of scheduling problem in multi-varieties and small-batch production mode, three additional constraint conditions...
1269