Cost Estimation Method of Post-Earthquake Rehabilitation of Power System
| Periodical | Advanced Materials Research (Volumes 446 - 449) |
|---|---|
| Main Theme | Trends in Civil Engineering |
| Edited by | Xiuli Du, Jianjun Zheng, Weiming Yan, Yue Li and Jianwei Zhang |
| Pages | 3083-3086 |
| DOI | 10.4028/www.scientific.net/AMR.446-449.3083 |
| Citation | Yan Ru Wang et al., 2012, Advanced Materials Research, 446-449, 3083 |
| Online since | January, 2012 |
| Authors | Yan Ru Wang, Jun Wu Dai, Mao Yu Zhang |
| Keywords | Cost Estimation, Power System, Rehabilitation |
| Price | US$ 28,- |
Power system related to the people's livelihood is an important lifeline and its rapid post-earthquake rehabilitation and reconstruction is particularly important. Considering the importance of power system, cost estimation method of post-earthquake rehabilitation of power system is proposed. Based on the direct economic losses of power system, post-earthquake rehabilitation cost is given by index of the post-earthquake adjustment factor which is put forward according to post-earthquake rehabilitation cost and direct economic losses of power system in “5.12” Wenchuan earthquake. Cost estimation method of post-earthquake rehabilitation of power system could provide good suggestions for post-earthquake rehabilitation work.