Paper Title:

Cost Estimation Method of Post-Earthquake Rehabilitation of Power System

Periodical Advanced Materials Research (Volumes 446 - 449)
Main Theme Trends in Civil Engineering
Edited by Xiuli Du, Jianjun Zheng, Weiming Yan, Yue Li and Jianwei Zhang
Pages 3083-3086
DOI 10.4028/www.scientific.net/AMR.446-449.3083
Citation Yan Ru Wang et al., 2012, Advanced Materials Research, 446-449, 3083
Online since January, 2012
Authors Yan Ru Wang, Jun Wu Dai, Mao Yu Zhang
Keywords Cost Estimation, Power System, Rehabilitation
Price US$ 28,-
Article Preview
View full size
Abstract

Power system related to the people's livelihood is an important lifeline and its rapid post-earthquake rehabilitation and reconstruction is particularly important. Considering the importance of power system, cost estimation method of post-earthquake rehabilitation of power system is proposed. Based on the direct economic losses of power system, post-earthquake rehabilitation cost is given by index of the post-earthquake adjustment factor which is put forward according to post-earthquake rehabilitation cost and direct economic losses of power system in “5.12” Wenchuan earthquake. Cost estimation method of post-earthquake rehabilitation of power system could provide good suggestions for post-earthquake rehabilitation work.