Production Dynamic Scheduling among Factories Based on Multi-Agent |
|
| Journal | Advanced Materials Research (Volumes 466 - 467) |
|---|---|
| Volume | Intelligent System and Applied Material |
| Edited by | Wu Jinhui, Zhao Maotai and Wu Bo |
| Pages | 1386-1391 |
| DOI | 10.4028/www.scientific.net/AMR.466-467.1386 |
| Citation | Ling Qin et al., 2012, Advanced Materials Research, 466-467, 1386 |
| Online since | February, 2012 |
| Authors | Ling Qin, Shu Lin Kan |
| Keywords | Dynamics, Factories, Multi-Agent, Scheduling |
| Abstract | To solve fluctuation problem in production plan and scheduling among factories, a logic framework of production dynamic scheduling among factories based on multi-agent technology was constructed. In this framework, the production dynamic scheduling multi-agent negotiation rules and mechanism among factories were established. Furthermore, the production dynamic scheduling multi-agent negotiation procedure among factories was investigated. Finally, the simulation system of production dynamic scheduling among factories based on multi-agent is demonstrated and validated by Flexsim software. It has shown the proposed method can improve the adaptability and stability of production plan and scheduling, and provide a support for optimal and dynamic production plan and scheduling among factories. |
| Full Paper |
Get the full paper by clicking here
|
