Paper Title:

Heavy Quayside Container Crane Working Process Visualization

Periodical Advanced Materials Research (Volumes 516 - 517)
Main Theme Electrical Power & Energy Systems
Edited by Jinyue Yan, Charles C. Zhou, Rutang Liao and Jianwen Wang
Pages 735-738
DOI 10.4028/www.scientific.net/AMR.516-517.735
Citation Hou Jun Lu et al., 2012, Advanced Materials Research, 516-517, 735
Online since May, 2012
Authors Hou Jun Lu, Hui Qiang Zhen, Wei Jian Mi
Keywords Control Logics, Quayside Container Crane, Visualization, Working Process
Price US$ 28,-
Article Preview
View full size
Abstract

The heavy quayside container crane is the key equipment of handling production in container terminal, because the general simulation system can not provide the detail information of the single crane unit during working process, this work proposed a novel method to visualize the working process of the crane. Analyzed the basic mechanisms and typical working condition, based on which, discussed the modeling method for working process visualization, and then gave the internal structure of 3D crane model. This work designed the control logic to drive the 3D graphic elements of the visualization system, implemented the working process visualization according to the working waiting list of the crane.