  Abstract

An automatic transfer system (ATS) was developed to monitor the a.c. voltage coming from Power Holding Company of Nigeria (PHCN) line for power failure conditions. Upon detection of an outage for a predetermined period of time, the standby generator is started, once is up to speed, the load is transferred from the PHCN line to the local Generator. This ATS is capable of electrically monitoring fuel level, oil level, Battery strength, next maintenance schedule and then start or stop the unmanned Generator from the computer system located in the comfort of homes or offices outside the Generator site. In this paper therefore, an Automatic Transfer System (ATS) for Power Generator is designed to improve the operation and maintenance of power generators. The ATS which includes both hardware and software module, provides a functionality that allows a power generator to be controlled and monitored from a remote location

  Info
Periodical
Advanced Materials Research (Volumes 62-64)
Edited by
A.O. Akii Ibhadode, I.A. Igbafe and B.U. Anyata
Pages
187-193
DOI
10.4028/www.scientific.net/AMR.62-64.187
Citation
A.U. Adoghe, I.A. Odigwe, "Automatic Transfer and Controller System for Standby Power Generator", Advanced Materials Research, Vols. 62-64, pp. 187-193, 2009
Online since
February 2009
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Dan Song, Zhi Rui Liang, Zhu Zhan, Hong Qing Gan
Chapter 6: Power System and Automation
Abstract:In recent years, a new type of 380V low voltage fixed circuit breakers are used in newly built substations. Fixed circuit breakers without...
1081
Authors: Ping Chen, Lei Wu, Zhan Tao Zhang
Chapter 4: Electrical Engineering, Apparatus and Power Engineering
Abstract:Base on the conclusion of the DC system configuration of UHV (Ultra-high Voltage) converter substation. Analysis the settings of the 3rd DC...
531
Authors: Qing Liu, Yong Wang
Chapter 2: Measurement and Instrumentation, Monitoring, Testing and Detection Technologies
Abstract:Through the analysis of specific test requirements, this topic design the overall architecture of the automatic test system. In the hardware...
1003