Paper Title:
Double-Workshop Plan Model of Mixed Chlor-Alkali Production Process
  Abstract

Double-workshop mixed chlor-alkali planned model production process is a multi-level multi-product multi-constraint mixed batch planning problem production line model, taking into account the actual production of joint production of dual-workshop mode of production to determine the products and materials at various workshops, various Plan period on the production quantity, at the end of each period to meet the delivery needs of the type and quantity simultaneously, during the product implementation plan the goal of profit maximization. It uses particle swarm algorithm to reach the answer, indicating the feasibility of the method and effectiveness through examples of the calculation.

  Info
Periodical
Advanced Materials Research (Volumes 69-70)
Edited by
Julong Yuan, Shiming Ji, Donghui Wen and Ming Chen
Pages
611-615
DOI
10.4028/www.scientific.net/AMR.69-70.611
Citation
X. H. Dai, W. L. Wang, Y. W. Zhao, H.X. Teng, "Double-Workshop Plan Model of Mixed Chlor-Alkali Production Process", Advanced Materials Research, Vols. 69-70, pp. 611-615, 2009
Online since
May 2009
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Tian Hua Yang, Wan Li Xing, Xing Ping Kai, Run Dong Li, Ye Guang He
Abstract:Rice straw and Tiefa coal were used as experimental materials. Under the conditions of different temperatures and Cl/K molar ratio, the...
335
Authors: Lun Hai Yin, Rui Bai, Wan Li Guo
Abstract:Raw slurry blending process is the key process in the sintering alumina production. In this blending process, raw materials are alkali...
667
Authors: Oana Dodun, Vasile Merticaru, Laurenţiu Slătineanu, Gheorghe Nagîț, Constantin Neamtu
Chapter 7: Manufacturing Engineering
Abstract:The necessity of increasing the products competitiveness is one of the main requests valid for the small and medium enterprises. A better...
353