Paper Title:
An Extended CPM for Resource-Constrained Project Scheduling
  Abstract

In order to apply traditional CPM in resource-constrained project scheduling, the activity network is firstly formalized for resource-constrained project scheduling. Then Resource constraint in project is presented and an algorithm of the extended CPM is developed for resource-constrained project scheduling. Finally a case is conducted, which shows the accuracy and effectiveness of the extend CPM.

  Info
Periodical
Advanced Materials Research (Volumes 69-70)
Edited by
Julong Yuan, Shiming Ji, Donghui Wen and Ming Chen
Pages
695-699
DOI
10.4028/www.scientific.net/AMR.69-70.695
Citation
C. H. Ju, Y. Xie, "An Extended CPM for Resource-Constrained Project Scheduling", Advanced Materials Research, Vols. 69-70, pp. 695-699, 2009
Online since
May 2009
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jian Xun Qi, Zhi Nan Kan
Chapter 27: Project Management and Engineering Management
Abstract:As the particularity of power engineering projects, in order to achieve great economic and social benefits as soon as possible, the owner...
3031
Authors: Li Jun Duan
Chapter 5: Numerical Methods, Computation Methods and Algorithms for Modeling, Simulation and Optimization, Data Mining and Data Processing
Abstract:Efficient resource scheduling in dynamic environment reveals several challenges due to its high heterogeneity, dynamic behavior, and space...
1868