Paper Title:
Critical Threshold Value for Monitoring & Management of Cable Tension Force in Cable-Stayed Bridge
  Abstract

  Info
Periodical
Key Engineering Materials (Volumes 270-273)
Edited by
Seung-Seok Lee, Dong-Jin Yoon, Joon-Hyun Lee and Sekyung Lee
Pages
1977-1982
DOI
10.4028/www.scientific.net/KEM.270-273.1977
Citation
H. N. Cho, Y. M. Choi, S. C. Lee, K. K. Kang, M. Y. Choi, "Critical Threshold Value for Monitoring & Management of Cable Tension Force in Cable-Stayed Bridge ", Key Engineering Materials, Vols. 270-273, pp. 1977-1982, 2004
Online since
August 2004
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Qing Chen Zhang, Quan Sheng Sun
Abstract:Parameter changes of a bridge in construction process must have an effect on its stress and alignment.And different parameters ,in the same...
851
Authors: Wen Juan Yao, Wu Yang, Xiao Yu Liu
Chapter 3: Frontiers of Civil Engineering
Abstract:Taking Tianjin Yonghe bridge for example, the finite element method is adopted to simulate each stages of cable replacement process, the...
1383
Authors: Mei Yu, Hai Li Liao, Qiao Li, Cun Ming Ma, Ming Liu
Abstract:For the intermediate pylons of multi-pylon cable-stayed bridges can’t be connected by backstays to fixed points, it is possible to produce...
340
Authors: Shao Xia Gao, Bao Chu Yu, Chao Gao, Zhen Zhen Wang
Chapter 9: Bridge Engineering
Abstract:The cable-stayed bridge is a type of the bridges that can utilize the material properties fully and rationally.They are most favored by...
2058
Authors: Hong Tao Bi, Yan Li
Abstract:An optimization model was proposed in order to investigate the effect of the non-stayed cable segment length on the performance of a...
131