Paper Title:
The Key Technology of Skew Continuous Prestressed Concrete Box Girder Bridges with Incremental Launching Method
  Abstract

Incremental launching method is a construction technology for prestressed concrete continuous bridges widely used in China. In the incremental launching method, the superstructure of a bridge is erected from one side of bridge longitudinally to the opposite bank. Compared with other technology for bridge erection methods, it may reduce the cost of labor, shorten the construction period and save the assembly yard. So it is a competitive construction method for medium-span prestressed concrete continuous bridges. A large number of skew bridges will be built especially at mountain area, so it is very necessary to research on incrementally launching method for skew bridges. The objective of the study presented in this paper is to introduce the method used in the Lishui Bridge in Zhangjiajie city of China.

  Info
Periodical
Key Engineering Materials (Volumes 400-402)
Edited by
Jingsi Huo, Yan Xiao, Zongjin Li and Shuaib Ahmad
Pages
639-644
DOI
10.4028/www.scientific.net/KEM.400-402.639
Citation
Z. C. Tian, G. L. Zeng, M. Chen, H. L. Yue, "The Key Technology of Skew Continuous Prestressed Concrete Box Girder Bridges with Incremental Launching Method", Key Engineering Materials, Vols. 400-402, pp. 639-644, 2009
Online since
October 2008
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jin Sheng Du, Hai Bin Liu
Abstract:In some long-span prestressed concrete box girder bridges, excessive deflections of main girders are often observed. These unacceptable...
1436
Authors: Yong Huang, Jun Jie Wang, De Yin Jin
Abstract:The damage of bearing will change the boundary condition for whole bridge, if we do not take account of bearing failure, the error of...
1029
Authors: Wen Shuo Liu, Gong Lian Dai
Chapter 9: Bridge Engineering
Abstract:In order to investigate the additional expansion force of continuous welded rails (CWR) on extra-long continuous bridges of high-speed...
2304
Authors: Hong Zhang, Yong Tao Zhang, Ren Zhong Zhou
Chapter 16: Advanced Design Technology
Abstract:In Long-span bridge construction by incremental launching method, due to its quiet heavy launching weight, long cantilever and complex...
3299
Authors: Yu Liang He, Yi Qiang Xiang, He Xin Ke, Li Si Liu
Chapter 4: Road and Bridge Engineering
Abstract:Taking the four-span 40m simply supported multi-box steel-concrete composite girder bridge in the ProjectⅡ of Qiushi Expressway in Hangzhou...
1547