Paper Title:
Multi-Objective Scheduling for Parallel Jobs on Grid
  Abstract

Focused on the complexity of the parallel job scheduling on heterogeneous Grid, the paper proposes a multi-objective optimization based scheduling algorithm. The algorithm first splits the parallel job up into a series of independent processes with constraints, and then adopts particles to represent the mapping of job-resource. Multi-objective PSO is employed to simultaneously optimize the scheduling objectives of throughput and average turnaround time. Experimental result indicates that the proposed approach is effective while dealing with large scale parallel jobs scheduling on heterogeneous Grid and outperforms other conventional algorithms.

  Info
Periodical
Key Engineering Materials (Volumes 439-440)
Edited by
Yanwen Wu
Pages
1281-1286
DOI
10.4028/www.scientific.net/KEM.439-440.1281
Citation
P. F. Liu, S. B. Dong, "Multi-Objective Scheduling for Parallel Jobs on Grid", Key Engineering Materials, Vols. 439-440, pp. 1281-1286, 2010
Online since
June 2010
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Bei Zhan Wang, Xiang Deng, Wei Chuan Ye, Hai Fang Wei
Chapter 13: Mechanical Control and Information Processing Technology
Abstract:The particle swarm optimization (PSO) algorithm is a new type global searching method, which mostly focus on the continuous variables and...
1787
Authors: Fang Liu, Xiu Yang
Chapter 10: Smart Grid and Microgrid Technologies
Abstract:Reducing environmental pollution and achieving economic operation have become focus of the research about micro-grid (MG). The minimum...
1307
Authors: Zheng Ying Lin, Wei Zhang
Chapter 8: Machine Parts and Mechanisms of Technological Equipment, Control and Automation
Abstract:Due to several mutual conflicting optimized objectives in the hybrid flow shop scheduling problem, its optimized model, including three...
529