Paper Title:
Research and Development for Cable Industry-Oriented Manufacturing Process Information System Based on Rough Set Theory
  Abstract

The characters of the Manufacturing Process Information System (MPIS) for industry-oriented are included here. The characters of the process and the difficulty faced for cable industry are summarized. Then, A model structure of MPIS for cable industry is established. A method based on Rough Set Theory for processing plan knowledge system is put forward. An example for processing knowledge finding is studied at last.

  Info
Periodical
Key Engineering Materials (Volumes 467-469)
Edited by
Dehuai Zeng
Pages
1273-1279
DOI
10.4028/www.scientific.net/KEM.467-469.1273
Citation
L. Bin, "Research and Development for Cable Industry-Oriented Manufacturing Process Information System Based on Rough Set Theory", Key Engineering Materials, Vols. 467-469, pp. 1273-1279, 2011
Online since
February 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Wen Juan Yao, Wu Yang, Xiao Yu Liu
Chapter 3: Frontiers of Civil Engineering
Abstract:Taking Tianjin Yonghe bridge for example, the finite element method is adopted to simulate each stages of cable replacement process, the...
1383
Authors: Dai Yong Jia, Lu Yan Sui, Ming Lai He
Chapter 2: Building Materials, Mechanical Engineering and Environment
Abstract:In this study, an experiment platform was built up to determine the key parameter, mass transfer coefficient, of the ventilation and...
151
Authors: Xin Ying Xie, Xin Sheng Yin
Chapter 2: Structural Engineering
Abstract:The article analyzes the prestressed concrete cable-beam structure system when it is on the condition of sigle span and sigle direction.The...
1141
Authors: Feng Zhang
Chapter 2: Structural Engineering
Abstract:Cable net is a typical kind of flexible space structure, the effective stiffness forming need be through the prestress. The distribution of...
1282
Authors: Han Bing Liu, Long Lin Wang, Guo Jin Tan, Yong Chun Cheng
Chapter 6: Industrial and Civil Engineering
Abstract:Based on a project of a 22+55+22m continuous composite box beam bridge made of prestressed Concrete, using influence matrix, Numerical...
1082