Paper Title:
Key-Points of Construction Techniques for Concrete Pipe-Jacking Tunnel
  Abstract

As a trenchless technology for buried pipeline, pipe-jacking tunnel technology is increasingly displaying the enormous superior in buried pipeline remodeling in city. Combining characteristics of pipe-jacking tunnel, this paper analyzed key-points of construction technology and engineering troubles which occurrence possibly in construction, and introduced some treatment measures. This paper is also sum-up of pipe-jacking construction many years, maybe provide some help for the same kind of construction.

  Info
Periodical
Key Engineering Materials (Volumes 480-481)
Edited by
Yanwen Wu
Pages
1271-1277
DOI
10.4028/www.scientific.net/KEM.480-481.1271
Citation
Z. Y. Yang, "Key-Points of Construction Techniques for Concrete Pipe-Jacking Tunnel", Key Engineering Materials, Vols. 480-481, pp. 1271-1277, 2011
Online since
June 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Wen Long Ding, Tao Liu
Abstract:For subway tunnels such as Nanjing Metro II excavated by mining method, one of the most important reinforcement methods for preventing...
1769
Authors: Xin Zhi Li, Shu Cai Li, Shu Chen Li, Xian Da Feng, Chao Yuan, Wen Ting Li
Chapter 10: Chemistry Science and Applied Chemistry
Abstract:The Qi-Great Wall tunnel which crossed the Qi -Great Wall ruins was a large span double-arch tunnel with two-way and six-lane and the maximum...
2245
Authors: Chun Mei Xu, Lu Chen, Yuan Cai Liu
Chapter 4: Building Technology and Science
Abstract:Combine with the practice of Kunming city first-phase subway project construction, detailedly introduce the success construction experiences...
2090