Construction Technique of Inspection Well for Water Drainage Pipe Jacking Project with Sunk Tube Method
  Abstract

Inspection well is needed for water drainage pipe jacking project in municipal engineering construction, and the deep ones are usually built by sunk tube method. According to a real project, this paper dissertates the construction technique of deep buried inspection well with sunk tube method under the condition of abundant water existence form the aspect of design theory and construction technique and emphasizes the problems and countermeasures during tube sinkage. The practice shows that inspection well with sunk tube method could resolve the difficulty of construction in Water-soaked Stratum.

  Info
Periodical
Key Engineering Materials (Volumes 480-481)
Edited by
Yanwen Wu
Pages
1283-1288
DOI
10.4028/www.scientific.net/KEM.480-481.1283
Citation
Z. Y. Yang, "Construction Technique of Inspection Well for Water Drainage Pipe Jacking Project with Sunk Tube Method", Key Engineering Materials, Vols. 480-481, pp. 1283-1288, 2011
Online since
June 2011
Authors
Export
Price
$32.00
Share

In order to see related information, you need to Login.

In order to see related information, you need to Login.

Authors: Jun Wei Liu, Zhong Miao Zhang, Nian Wu Liu, Feng Yu
Chapter 6: Surface Technology
Abstract:In this study a comprehensive field test program was carried out to closely monitor the ground responses during open-ended concrete pipe...
2024
Authors: Liu Hui
Abstract:Pipe jacking, for its incomparable technical superiority, has been gaining wider and wider application in municipal construction project....
1260
Authors: Liu Hui
Abstract:During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall...
1266
Authors: Zhuan Yun Yang
Abstract:As a trenchless technology for buried pipeline, pipe-jacking tunnel technology is increasingly displaying the enormous superior in buried...
1271
Authors: Zhuan Yun Yang
Abstract:Considering the current domestic situation that there is no provision for shallow pipe-jacking (with overburden soil layer not thicker than 3...
1278