Research on Implementation Mechanism of Networked Collaborative Design System Based on Project Management |
|
| Journal | Materials Science Forum (Volumes 628 - 629) |
|---|---|
| Volume | Advances in Materials Manufacturing Science & Technology XIII Volume II |
| Edited by | Dongming Guo, Jun Wang, Zhenyuan Jia, Renke Kang, Hang Gao, and Xuyue Wang |
| Pages | 19-24 |
| DOI | 10.4028/www.scientific.net/MSF.628-629.19 |
| Citation | Li Gang Qu et al., 2009, Materials Science Forum, 628-629, 19 |
| Online since | August, 2009 |
| Authors | Li Gang Qu, Wei Wang, Da Wei Wu |
| Keywords | Archetypal System, Collaborative Design, Implementation Mechanism, Project Management |
| Abstract | The functional and structural models of networked collaborative design system based on project management are brought forward in this paper. Its typical workflow is defined according to the system architecture. In process of studying implementation mechanism of collaborative design system, the algorithm of Fuzzy Analytic Hierarchy Process (F-AHP) is employed in choosing partners as personnel management mechanism, the method of Design Structure Matrix (DSM) is applied in process of decomposing and assigning design tasks, and weight-coefficient recursively statistic algorithm is used in controlling task schedule. The archetypal system of networked collaborative design based on project management is developed and tested, realization supported “multi-user &multi-task” is drown the conclusion. |
| Full Paper |
Get the full paper by clicking here
|
