Papers by Author: Xing Fu Zhong

Paper TitlePage

Abstract: Crude oil separating is an important technological process in the petroleum industry. Pipe separation technology (PST) is a new kind of separating method in oil-water-gas separation. To compare with conventional gravity separators, the new separator based on PST is low weight, low cost, efficient and convenient to maintain. This paper introduces this new compact separator, technological process and performance test. The test results show that the compact separator has good separating effect. When the water-cut inlet is from 50% to 60%, and the mixture flow rate is from 40 t/hr to 100 t/hr, the water-cut in oil outlet is less than 5%, and the oil-cut in water is less than 100 mg/l.
833
Abstract: Marine risers are key apparatus in connecting the subsea wells to the oil production platform. When the ocean current flow past a riser, the vortex shedding behind riser may induce vibration. If the frequency of vortex shedding is approaching or equal to the natural frequency of riser, the resonance will be generated. Such phenomenon leads to the potential fatigue damage of riser. Therefore, the safety and assurance of marine risers are widely arousing the interest of offshore engineering. In present paper, previous apparatus or methods in suppressing vortex-induced vibration (VIV) of risers used in marine engineering are firstly analyzed, and correspondingly the conditions in design of VIV suppressors are proposed. Based on the Bernoulli equation, the disturbance in flow around a bluff body and the relationship of vortex shedding in span-wise direction, a new method of VIV suppression is proposed. The numerical results have shown that the vibration of risers could be reduced by such disturbance.
9
Abstract: The new Electromagnetic Imaging Tool (EMIT) is introduced in this study. It is also described that the basic inspection theory, system structure and applications. The EMIT can determine whether metal loss or casing damage has occurred internally or externally. A 3D casing image can be supplied, including horizontal, vertical profile. The experimental results show that the EMIT has a “high-resolution” for MFL method in the casing well because of the steel brush structure. The minimal diameter of the inspection hole is 4 mm, and the thickness determination error of casing wall is 0.4 mm. A number of examples from oilfield are presented.
19
Showing 1 to 3 of 3 Paper Titles