On Mathematical Models of Some Optimization Problems Arising in the Production of Autoclaved Aerated Concrete

Article Preview

Abstract:

A mathematical model of an optimization problem to define a short-term (one month) production plan which implements the best use of the production capacity with the condition of meeting the demand is proposed. Long-term planning of autoclaved production (up to six months) with the account of the dynamics of demand and possible residual products in stock are also considered. The results of computational experiments are presented.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

173-181

Citation:

Online since:

May 2017

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2017 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Information on http: /www. dci-group. com. ua/gazobeton_production. html.

Google Scholar

[2] Information on http: /www. c-practica. ru/gazobeton/gazobeton. html.

Google Scholar

[3] Sigal I.H., Ivanova А.P. (2003) Introduction to Applied discrete programming: models and computational algorithms: Textbook (in Russian). Moscow: Fizmatlit, 230.

Google Scholar

[4] Sergienko I.V. (1988) Mathematical models and methods for solving discrete optimization problems (in Russian). Kiev: Naukova Dumka, 472.

Google Scholar

[5] Information on http: /www. gurobi. com/resources/switching-to-gurobi/open-source-solvers.

Google Scholar