Optimization of FengTai Power Plant 350MW Supercritical Unit Water Supply RB Control Strategy

Abstract:

Article Preview

The improvement of RB is significant for safety of both the power plant and power grid. This paper, took the 2 × 350MW unit of Inner Mongolia Huaneng Power Plant for instance, researched on three ways to improve water supply RB, like taking a proper sliding pressure curve, improving the water supply system and optimizing the boiler combustion. In the research, we succeeded to maintain main parameters of the unit within a safety range during RB operation, and avoided a unit trip accident causing by one single pump’s fault trip. Therefore, the research’s success settled a good base for the unit’s safe and stable operation.

Info:

Periodical:

Edited by:

Han Zhao

Pages:

2527-2529

DOI:

10.4028/www.scientific.net/AMM.130-134.2527

Citation:

J. T. Guo and J. Xin, "Optimization of FengTai Power Plant 350MW Supercritical Unit Water Supply RB Control Strategy", Applied Mechanics and Materials, Vols. 130-134, pp. 2527-2529, 2012

Online since:

October 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.