Simulation of Improper Construction Procedure and Crack Analysis

Abstract:

Article Preview

Based on the real construction technology, process and environment of Yuquanxi Bridge, the finite element method was applied in the research to make sure the crack mechanism and find out the impact of improper construction procedure on cracks of Block No.0. By comparing the numerical results with actual cracks condition, the impact of improper construction procedure on cracks of Block No.0 is uncovered clearly and it proves that to master of correct construction procedures and methodology is of great importance in construction a bridge.

Info:

Periodical:

Edited by:

Weijun Yang and Qiusheng Li

Pages:

3236-3239

Citation:

W. X. Huang and L. Y. Tan, "Simulation of Improper Construction Procedure and Crack Analysis", Applied Mechanics and Materials, Vols. 204-208, pp. 3236-3239, 2012

Online since:

October 2012

Export:

Price:

$41.00

[1] H.H. Zhu, M.C. Chen, Y.J. Yuan, Research on the cracking and its treatment of PC continuous box girder, Beijing (China): China Communications Press (2004).

[2] D.Y. Moon, J.S. Sim, H. Oh, Practical crack control during the construction of precast segmental box girder bridges, Computers & Structures, Vol. 83( 2005), pp.2584-2593.

DOI: https://doi.org/10.1016/j.compstruc.2005.05.001

[3] M. Briffaut, F. Benboudjema, J.M. Torrenti, G. Nahas, A thermal active restrained shrinkage ring test to study the early age concrete behaviour of massive structures, Cement and Concrete Research, Vol. 41(2011), pp.704-708.

DOI: https://doi.org/10.1016/j.cemconres.2010.09.006

[4] A. Sivakumar, M. Santhanam, A quantitative study on the plastic shrinkage cracking in high strength hybrid fibre reinforced concrete, Cement and Concrete Composites, Vol. 29(2007), pp.575-581.

DOI: https://doi.org/10.1016/j.cemconcomp.2007.03.005

[5] F. Xu, Study on the key factors of temperature effect of concrete box-girder bridges, Ph.D. Dissertation, Huazhong University of Science & Technology, Wuhan, China(2009).