The Air Tightness Test Method of the High Speed Train

Abstract:

Article Preview

The tightness of interior space in condition of a high speed train with its side door, side window closed called train air-tightness. The paper introduces the air tightness of the high speed train and the basic methods for air tightness testing. It also applies a constant pressure leak model to test and points out that the importance of air tightness for high speed train.

Info:

Periodical:

Edited by:

Mohamed Othman

Pages:

482-486

Citation:

T. T. Zhang and F. Wang, "The Air Tightness Test Method of the High Speed Train", Applied Mechanics and Materials, Vols. 229-231, pp. 482-486, 2012

Online since:

November 2012

Export:

Price:

$38.00

[1] Xia H, Cao YM and Zhang N (2007), Numerical Analysis of Vibration Effects of Metro Trains on Surrounding Environment, Int. J. Struct. Stability & Dyn. 7(1): 154-166.

[2] M. S. Howe, Prolongation of the rise time of the compression wave generated by a high speed train entering a tunnel. Proc. Roy. Soc. London A455 (1999) 863-878.

[3] T. Hara, Aerodynamic force acting on a high speed train at tunnel entrance. Quart. Report Railway Tech. Res. Inst. 2(2) (1961) 5-11.

[4] Von RolfKlingel, Minden. Dmckerttichfigte Reise—zugwagen Neubaustrecken Grundlagen I~ungen fttr Klimaanlagen[J].ZEV-Glas,Ann.112(1988)(1).

[5] Measurementmethods ofairtightness ofa railway vehicle andits e1. Ement [S]. French Standard NF F 17-011 November 1991.

[6] Li YJ, Mei YG(2009), Preliminary discussion of EMU vehicle gas-tightness indicator. RAILWAY LOCOMOTIVE & CAR. 1008-7842(2OO9)02-0031-0.