Project Team Formation Based on Knowledge and Cooperation Degree

Abstract:

Article Preview

To aim at the project team formation problem, this study proposes a formation model based on knowledge and cooperation degree. The ability of individual member and cooperation degree of team members are considered. In addition ,it presents a way of measuring candidate’s ability about knowledge, and establishes a collaborative model to measure the cooperation degree between team members. Furthermore, a calculation method of knowledge and cooperation degree is proposed, and then a mathematical model is established. Finally it presented a solution base on Genetic Algorithm for this model.

Info:

Periodical:

Edited by:

Ran Chen

Pages:

3143-3147

DOI:

10.4028/www.scientific.net/AMM.44-47.3143

Citation:

X. R. Huang et al., "Project Team Formation Based on Knowledge and Cooperation Degree", Applied Mechanics and Materials, Vols. 44-47, pp. 3143-3147, 2011

Online since:

December 2010

Export:

Price:

$35.00

[1] QIU Jindong, GU Xinjian. The Probe of Project Management for Mass Customization. Group Technology & Production Modernization(in Chinese), Vol. 20(2003), pp.34-37.

[2] FENG Bo, FAN Zhi-ping, FU Na. A Method for Team Partner Selection Based on Collaborative Information. OPERATIONS RESEARCH AND MANAGEMENT SCIENCE(in Chinese). Vol. 16(2007), pp.58-61.

[3] Chien, C. F., & Chen, L. F. Data mining to improve personnel selection and enhance human capital: A case study in high-technology industry. Expert Systems with Applications, Vol. 34(2008), pp.280-290.

DOI: 10.1016/j.eswa.2006.09.003

[4] Huang, M., Tsou, Y., & Lee, S. Integrating fuzzy data mining and fuzzy artificial neural networks for discovering implicit knowledge. Knowledge-Based Systems, Vol. 19(2006), pp.396-403.

DOI: 10.1016/j.knosys.2006.04.003

[5] Tzu Liang Tseng, Chun Che Huang, How Wei Chu, Roger R. Gung. Novel approach to multi-functional project team formation . International Journal of Project Management, Vol. 22(2004), pp.147-159.

DOI: 10.1016/s0263-7863(03)00058-9

[6] Hyeongon Wi, Seungjin Oh, Jungtae Mun, Mooyoung Jung. A team formation model based on knowledge and collaboration. Expert Systems with Applications, Vol. 36(2009), pp.9121-9134.

DOI: 10.1016/j.eswa.2008.12.031

[7] WANG Juan-ru, ZHAO Song-zheng. On Selection ofPartnersUsing AHP and FPP in Virtual Team. Industrial Engineering Journal (in Chinese). Vol. 10(2007), pp.105-108.

[8] CHEN Ya-li. Study on partner-selection in virtualR&D team based on fuzzy synthetic evaluation. JOURNAL OFHENAN POLYTECHNIC UNIVERSITY (in Chinese). Vol. 28(2009), pp.132-136.

[9] YU Ji-xiang, CUI Wen-tia. Model on Group Members Selecting and the Algorithm. OPERATIONS RESEARCH AND MANAGEMENT SCIENCE(in Chinese). Vol. 14(2005), pp.128-132.

[10] Christina Scott-Young, Danny Samson. Project success and project team management: Evidence from capital projects in the process industries. Journal of Operations Management, Vol. 26(2008), p.749–766.

DOI: 10.1016/j.jom.2007.10.006

[11] M. Gen, R. Cheng. Genetic Algorithms and Engineering Optimization, (John Wiley & Sons, Inc., New York 2000).

In order to see related information, you need to Login.