Facility Closeness Relationship Determination in the Construction Site

Abstract:

Article Preview

Construction site layout planning (CSLP) is one of the critical activities in construction planning conducted by the managers on the construction sites. CSLP is significantly influenced by the interaction flows and distance between the facilities. The paper aims to apply fuzzy rule-based system developed in the manufacture industry to determine the facility closeness relationship in the construction site. Facility closeness relationship with consideration of quantitative and qualitative factors can be successfully determined by the procedure based on fuzzy rule-based system.

Info:

Periodical:

Edited by:

Dongye Sun, Wen-Pei Sung and Ran Chen

Pages:

476-479

DOI:

10.4028/www.scientific.net/AMM.71-78.476

Citation:

X. Ning "Facility Closeness Relationship Determination in the Construction Site", Applied Mechanics and Materials, Vols. 71-78, pp. 476-479, 2011

Online since:

July 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.