A Productivity Improvement of a Cookware Assembly Line

Abstract:

Article Preview

This research objective is to improve the productivity of cookware assembly line by means of time and distance reductions. The motion study and line balancing techniques were applied to the entire assembly operations. A bottle neck was identified to where the operation with inadequate machine layout and workplace organization, including the unbalanced workloads. The new workplace layout and new working method for operators were designed and implemented as well as balancing the assembly line. Specifically, the conveyor speed and duration between the consecutive workpieces in the production line were adjusted to 0.10 m/s and 50 cm, respectively. The number of operators needed in the process can be reduced from 14 persons to 11 persons. The cycle time for assembling process is decreased from 12 to 5 second.

Info:

Periodical:

Edited by:

Guanghsu Chang, Jieh-Shian Young and Wirachman Wisnoe

Pages:

1398-1402

Citation:

J. Niamsawan and S. Prombanpong, "A Productivity Improvement of a Cookware Assembly Line", Applied Mechanics and Materials, Vols. 799-800, pp. 1398-1402, 2015

Online since:

October 2015

Export:

Price:

$38.00

* - Corresponding Author

[1] Pritchard, R.D., Productivity Measurement and Improvement: Organizational Case Studies, Praeger Publishers, New York, (1995).

[2] V. Minzu, and J-M. Henrioud, Assignment stochastic algorithm in multi-product assembly lines, " in Proceedings of ISATP, 37, (1997), pp.103-114, IEEE Press.

[3] M. Z. Matondang and M. I. Jambak Soft Computing in Optimizing Assembly Lines Balancing, Journal of Computer Science, 6 (2), (2010), pp.141-162.

DOI: https://doi.org/10.3844/jcssp.2010.141.162

[4] N Ismail, G. R. Esmaeilian, M. Hamedi, and S. Sulaiman Balancing of parallel assembly lines with mixed-model product, International Conference on Management and Artificial Intelligence IPEDR Vol. 6 IACSIT Press, Bali, Indonesia, (2011).

[5] Drucker, P.F., Knowledge-worker productivity: The biggest challenge, California Management Review XLI, Vol. 2 (1999), pp.79-94.

DOI: https://doi.org/10.2307/41165987

[6] Rekiek, B., Dolgui, A., Delchambre, A. and Bratcu, A., State of art optimization methods for assembly line design, Annual Reviews in Control, Vol. 26 (2002), pp.163-174.

DOI: https://doi.org/10.1016/s1367-5788(02)00027-5

[7] Bard, J.F., Assembly line balancing with parallel workstations and dead time. International Journal of Production Research 27, (1989), 1005–1018.

DOI: https://doi.org/10.1080/00207548908942604