Time Window Constraint Conflict Resolution Algorithm for Collaborative Design Process Scheduling

Abstract:

Article Preview

Aim at complex relationships among design tasks after task grouping for the collaborative product design process scheduling, the constraint conflicts of the task time windows would be generated in the task scheduling process, and the reasons of constraint conflicts are analyzed. Based on the least waiting times and time, a time window constraint conflict resolution algorithm is put forward, and the high parallel requirement is implemented for the collaborative design process.

Info:

Periodical:

Advanced Materials Research (Volumes 102-104)

Edited by:

Guozhong Chai, Congda Lu and Donghui Wen

Pages:

822-826

DOI:

10.4028/www.scientific.net/AMR.102-104.822

Citation:

Y. D. Yang et al., "Time Window Constraint Conflict Resolution Algorithm for Collaborative Design Process Scheduling", Advanced Materials Research, Vols. 102-104, pp. 822-826, 2010

Online since:

March 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.