Product Data Management Systems as a Tool in Engineering Change Management

Abstract:

Article Preview

Engineering change management (ECM) affect to cost that are generated during the designing and manufacturing process. ECM also affects to the time how fast the product is on market. The changes have to be made quickly and the notifications of the changes have to reach the person who may need the information. Product Data Management (PDM) is the system which is not only storage place for the data; it is a tool which should make ECs faster and more effective. This paper deals with the techniques that are in use to handle the ECs with the help of PDM system.

Info:

Periodical:

Advanced Materials Research (Volumes 1025-1026)

Edited by:

H.M. Song, J.W. Hu and H.K. Son

Pages:

1134-1140

DOI:

10.4028/www.scientific.net/AMR.1025-1026.1134

Citation:

M. Huhtala et al., "Product Data Management Systems as a Tool in Engineering Change Management", Advanced Materials Research, Vols. 1025-1026, pp. 1134-1140, 2014

Online since:

September 2014

Export:

Price:

$38.00

* - Corresponding Author

[1] G.Q. Huang and K.L. Mak: Int. J. Oper. Prod. Man Vol. 19 (1999), p.21.

[2] K. Rouibah and K.R. Caskey: Comput. Ind. Vol. 50 (2003), p.15.

[3] D. Habhouba, S. Cherkaoui and A. Desrochers: IEET. T. Syst. Man. Cy. C Vol. 41 (2011), p.344.

[4] J. Tavčar and J. Duhovnik: Robot. Cim-Int. Manuf Vol. 21 (2005), p.205.

[5] M. Huhtala, M. Lohtander and J. Varis: Confusing of terms PDM and PLM: examining issues from the PDM point of view, Proceedings of FAIM (2012).

[6] J.S. Könst, J.P. la Fontaine and M.G.R. Hoogeboom: Product Data Management – A Strategic Perspective (Maj Engineering Publishing, Geldermalsen 2009).

[7] Information on http: /aberdeen. com/Aberdeen Library/2385/BVR_EnabProdInnov_JB_2385. aspx.

[8] J. Stark: Product Lifecycle Management – 21st Century Paradigm for Product Realization (Springer-Verlag, USA 2005).

[9] B. Gott: World. Class. Des. Manufacture Vol. 2 (1995), p.18.

[10] B. Gascoigne: World. Class. Des. Manufacture Vol. 2 (1995), p.38.

[11] M. Storga, D. Pavlic and D. Marjanovic: Reducing design development cycle by data management within the design office, Proceedings of ICED (2001).

[12] F.J. Emmatty and S.P. Sarmah: J. Eng. Design Vol. 23 (2012), p.696.

[13] T. Dereli and H. Filiz: J. Eng. Design Vol. 13 (2002), p.141.

[14] J. B. ReVelle: Manufacturing Handbook of Best Practices (CRC Press, Boca Raton, 2002).

[15] T-C. Kuo, S.H. Huang and H.C. Zhang: Comput. Ind. Eng. Vol. 41 (2001), p.241.

[16] G. Boothroyd, P. Dewhurst and W.A. Knight: Product Design for Manufacture and Assembly (Taylor & Francis Group, Boca Raton, 2002).

[17] H. Eskelinen: Advanced Approaches to Analytical and Systematic DFMA Analysis (Acta Universitatis, Lappeenrantaensis 509, Finland 2013).

[18] P. Selvaraj, P. Radhakrishnan and M. Adithan: Int. J. Adv. Manuf. Tech. Vol. 42 (2009), p.13.

In order to see related information, you need to Login.