Study on Predicting Service Life of Concrete through Accelerated Permeability Test

Abstract:

Article Preview

In this paper, the corrosion of steel during the accelerated corrosion test was investigated through linear polarization method. The critical chloride ion concentration was determined according to the mentioned experimental results. Through the analysis of the experimental results of accelerated penetration test, the service life prediction equation of concrete structures was established. The 20V predicted results exhibited good compliance with the measured values, which indicated the reasonableness of the mentioned prediction method.

Info:

Periodical:

Advanced Materials Research (Volumes 163-167)

Edited by:

Lijuan Li

Pages:

3385-3390

DOI:

10.4028/www.scientific.net/AMR.163-167.3385

Citation:

W. L. Li et al., "Study on Predicting Service Life of Concrete through Accelerated Permeability Test", Advanced Materials Research, Vols. 163-167, pp. 3385-3390, 2011

Online since:

December 2010

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.