Application of Ground Freezing Method in Underground Construction

Abstract:

Article Preview

The goal of this paper is instructing the freezing construction scheme of alluvium of wind well in a mine. Through making scheme, designing cooling system and in-situ measuring frozen wall, succeed experiences of passing the expanded clay seam smoothly were achieved. It is hoped that the practical experiences will be reference to constructing mine in the analogous ground.

Info:

Periodical:

Advanced Materials Research (Volumes 255-260)

Edited by:

Jingying Zhao

Pages:

3727-3730

DOI:

10.4028/www.scientific.net/AMR.255-260.3727

Citation:

W. Y. Zhang and J. Wei, "Application of Ground Freezing Method in Underground Construction", Advanced Materials Research, Vols. 255-260, pp. 3727-3730, 2011

Online since:

May 2011

Authors:

Export:

Price:

$38.00

[1] Yunxiang Yang, Chengmin Guo: Mine Construction Technology Vol. 6 (2002), p.18 (In Chinese).

[2] Kaikui Leng: China Coalbed Methane Vol. 1 (2004), p.32 (In Chinese).

[3] Yan Xiao, Gong Cheng: Municipal Engineering Technology Vol. 3 (2002), p.20 (In Chinese).

[4] Wei Xun, Feng Jian: Coal Engineering Vol. 11 (2005), p.11 (In Chinese).

[5] Yajun Liu, Discussion of Design of Freezing Shaft Sinking, New Progress in mine construction projects mine construction—2009 National Conference Proceedings (Hefei University of Technology Press, 2009), p.325 (In Chinese).

In order to see related information, you need to Login.