Large-Scale Construction Equipment Joint Simulation Based on Multi-Body Dynamics Theory

Abstract:

Article Preview

In order to ensure the efficiency and safety of construction process control and failure analysis for the large-scale construction equipment in water conservancy engineering, which is based on specified equipment for some real engineering practices, namely TC2400-tower belt crane, a multi-body joint simulation dynamical model is given in this paper. Then, the data flow and operational process of the model are analyzed. Finally, a case study based on ADAMS and SOLIDWORKS platforms is performed to verify the validity and rationality of the given model.

Info:

Periodical:

Advanced Materials Research (Volumes 268-270)

Edited by:

Feng Xiong

Pages:

101-105

DOI:

10.4028/www.scientific.net/AMR.268-270.101

Citation:

Y. H. Li et al., "Large-Scale Construction Equipment Joint Simulation Based on Multi-Body Dynamics Theory", Advanced Materials Research, Vols. 268-270, pp. 101-105, 2011

Online since:

July 2011

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.