Flask Management in the Foundry Moulding Plan

Abstract:

Article Preview

There are many studies about foundry process design, foundry quality control, and foundry methods selection; however few researches have been published regarding foundry production scheduling management and expert system and flask management in casting production in particular. It is difficult for a production planner to judge whether there are enough flasks to meet the moulding plan in casting companies, and it is a highly troublesome problem to provide the planned castings with the compatible flasks as well. In order to address these two issues, in this paper we analyzes the cause of the problem and finds that the difficulty is to manage assembling flasks, and then constructs a decision analysis method. The method can make a validity analysis to the made moulding plan, and make up a flask assignment solution for the valid plan. Finally, a foundry moulding plan expert system based on the method is developed to prove this study.

Info:

Periodical:

Advanced Materials Research (Volumes 291-294)

Edited by:

Yungang Li, Pengcheng Wang, Liqun Ai, Xiaoming Sang and Jinglong Bu

Pages:

3195-3200

DOI:

10.4028/www.scientific.net/AMR.291-294.3195

Citation:

X. Y. Ji et al., "Flask Management in the Foundry Moulding Plan", Advanced Materials Research, Vols. 291-294, pp. 3195-3200, 2011

Online since:

July 2011

Export:

Price:

$38.00

[1] Zhigang Ao: Artificial Intelligence and Expert System (Mechanical Industry Press, Beijing 2010).

[2] Xinchuan Xia, Ri Li and Wenkai Liu: China Foundry Machinery & Technology Vol. 42(2007), p.6 (In Chinese).

[3] Yan Li, Qingguan Fang: Logistlcs technology Vol. 19(2009), p.89 (In Chinese).

[4] Tianyou Huang, Zhenzong Yu and Quanfang Chen: Foundry Vol. 38(1989), p.27 (In Chinese).

[5] Min Zhu: Production Plan and Implement Operation Manual (Posts and Telecom press, Beijing 2007).

In order to see related information, you need to Login.