Simulation of Operation Scheme of Su Cuo Buried Oil Pipeline

Abstract:

Article Preview

Aim at the actual operating condition of Su Cuo buried oil pipeline, the simulation model of this pipeline operation was built by the simulation software of TLNET to simulate the running states of pipeline in different operating conditions. With the target of saving energy and reducing consumption, the operating parameters of this pipeline with different throughput and different seasons were optimized, and the optimization results can be used to guide the pipeline operation.

Info:

Periodical:

Advanced Materials Research (Volumes 356-360)

Edited by:

Hexing Li, Qunjie Xu and Daquan Zhang

Pages:

3023-3027

DOI:

10.4028/www.scientific.net/AMR.356-360.3023

Citation:

L. X. Wei et al., "Simulation of Operation Scheme of Su Cuo Buried Oil Pipeline", Advanced Materials Research, Vols. 356-360, pp. 3023-3027, 2012

Online since:

October 2011

Export:

Price:

$38.00

[1] Juan Chen. Optimization desgin of long-distance transmission pipeline [D]. Southwest Petroleum Institute, 2004. (in Chinese).

[2] Wenbo Ju. JIANG Yuehong. Analyzing the example of Oil pipeline process[J]. Journal of Shengli Oilfield Staff University. 2007, 12(6): 54~56. (in Chinese).

[3] Xiaoheng Yang. Oil pipeline design and mangagement [M]. China university of petroleum press, 2006. (in chinese).

In order to see related information, you need to Login.