Fuzzy Ideal Points Method In Project Construction Sequence of the Downstream of Yellow River

Abstract:

Article Preview

Based on the project construction and investment feature of the Downstream of Yellow River, the structures were divided into flood control dike, water diversion, irrigation and water saving, soil erosion conservation and ecological projects, river mouth management and development and water resources information. Using fuzzy and decision making analysis theory and project planning investigation data, the different project weights were calculated and fuzzy ideal point model was set up. According to administrative region, the total area of the downstream of the Yellow River was divided as 14 sub-regions. Using the model to solve the project construction sequence, the sequence scheme of the water project construction was achieved. The results have an important significance for the different water projects construction of the downstream of the Yellow River.

Info:

Periodical:

Advanced Materials Research (Volumes 368-373)

Edited by:

Qing Yang, Li Hua Zhu, Jing Jing He, Zeng Feng Yan and Rui Ren

Pages:

1754-1758

DOI:

10.4028/www.scientific.net/AMR.368-373.1754

Citation:

Z. M. Zhou "Fuzzy Ideal Points Method In Project Construction Sequence of the Downstream of Yellow River", Advanced Materials Research, Vols. 368-373, pp. 1754-1758, 2012

Online since:

October 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.