Progress Delay Factors Analysis in Thermal Power Plant Ash Yard Project Based on PCA Method

Abstract:

Article Preview

In real operation in the thermal power, the ash fields project often cannot be finished following the progress schedule, and this always impact on project running smoothly. In this article some representative delay factors were obtained through the survey and their relationship between themselves were analyzed using PCA method in the SPSS software and their importance of resolving this issue were determined. What is more important, according to this article we can guide our practice and solve our progress delay. It provides us a commanding reference to improve the progress of thermal power plants.

Info:

Periodical:

Edited by:

Gary Yang

Pages:

217-221

DOI:

10.4028/www.scientific.net/AMR.429.217

Citation:

Y. N. Wu et al., "Progress Delay Factors Analysis in Thermal Power Plant Ash Yard Project Based on PCA Method", Advanced Materials Research, Vol. 429, pp. 217-221, 2012

Online since:

January 2012

Export:

Price:

$35.00

[1] Bai Shijun. System Project,. Electric Industry Press, 2006, pp.85-95(in Chinese).

[2] Yang Jiaben. Introduce of System Project,. Wuhan Polytechnic College Press, 2007, pp.146-147(in Chinese).

[3] Ma Guofen, You Jianxin, Du Xuemei. Management of factors restricting project schedule,. Tsinghua University Press, 2007, pp.48-50(in Chinese).

[4] Su Jingming, Zhou Jianbin, Actual articles for application of software SPSS,. Electric Industry Press, 2002, pp.291-295(in Chinese).

[5] He Xiaoqun. Modern statistical analysis method and its application,. Chinese People University Press, 1998, pp.316-320(in Chinese).

[6] Fu Zhongguang, Wang Liping, Ge Zhihua. Comprehensive evaluation of the power plant units' operational statues adopting principal component analysis,. Power Engineering, 2008, 28(4): pp.548-551 (in Chinese).

In order to see related information, you need to Login.