Joint Construction of Assembled Integrally Floor

Abstract:

Article Preview

This article expounds the floor ends and sides joint constructions of prestressed concrete floor and prestressed concrete hollow floor with added surface,as well as prestressed concrete hollow floor without added surface,and the comparation are available。Finally,some new construction methods are raised based on improving the seismic performance of integrally assembled prestressed concrete floor。

Info:

Periodical:

Advanced Materials Research (Volumes 446-449)

Edited by:

Xiuli Du, Jianjun Zheng, Weiming Yan, Yue Li and Jianwei Zhang

Pages:

775-779

DOI:

10.4028/www.scientific.net/AMR.446-449.775

Citation:

Q. N. Li et al., "Joint Construction of Assembled Integrally Floor", Advanced Materials Research, Vols. 446-449, pp. 775-779, 2012

Online since:

January 2012

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.