Fluctuating Pressure Calculation during the Progress of Trip in Managed Pressure Drilling

Article Preview

Abstract:

The calculation of fluctuating pressure is necessary during the progress of trip in the managed pressure drilling, because the bottomhole pressure should be constant during the progress of trip. The prediction model of the fluctuating pressure during the progress of trip was established based on the unsteady flowing theory. The actual application state of the prediction model was presented through a computational example. By the comparison between the computational result and the field test result, the computational result matches the field test result very well, which indicates the rationality and the accuracy of the model.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 468-471)

Pages:

1736-1742

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Lubinski A.(1977). Transient Pressure Surses due to Pipe Movement in an oil Well. Revue de L'Inst . Franc. du Pet.

Google Scholar

[2] Burkhardt J A.(1961). Wellbore Pressure Surges Produced by Pipe Movement. J.Pet.Tech.

Google Scholar